Ringkasan Projek (Overview)

Jumlah Dokumen

1,284

Menunggu Kelulusan

42

RFI Terbuka

15

Lukisan As-Built

320

Hierarki Sistem (4 Layers)

1
Layer 1: Project
PROJECT_001
2
Layer 2: Function
Design, Drawing, RFI, dll.
3
Layer 3: Discipline
Civil, Struct, Mech, Elect, dll.
4
Layer 4: Doc Control
Current vs Superseded (ASME Y14.35)

Tindakan Pantas